Autoclave free PVB and EVA laminating machine
Product Images
Product Property
Product Status : | New |
Sample Available : | yes |
Shipment Terms : | fob,Negotiable |
Payment Mode : |
T/T,cash,cheque,Credit Card,Negotiable |
Description
Our company inBeijingnew both center has booth and booth, 24 session of china international glass industry technology exhibition booth: E4 states museum, 201 booths, PVB assembly, the clamp gum show. Time: on may 24 to may 27, 2013
Autoclave free PVB and EVA laminating machine
We invent one step PVB and EVA laminating machine, the machine has characteristic:
1、the machine that laminating safety glass with PVB film can laminating in one step, without pre-press exhaust machine
2、laminating PVB glass without autoclave.
3、Not need condition room for close glass with PVB film.
4、machine works with PLC and touching monitor
5、the machine has many-layers for working layers, and many heating layers, and one vacuum pump , every heating layer works independently
6、It need 1-4 hours one time for PVB laminating glass of the machine;
7、Produce cost of PVB Laminating glass is near that of EVA laminating glass (5mm+5mm glass PVB laminating cost is 1.3- -2 kW*hour)
8、PVB film is same to others of using in autoclave .
9、PVB laminating machine can laminating glass with fabric;
10、PVB laminating machine can also laminating safety glass with EVA film.
SPECIFICATIONS:
Many working platforms, each working platform is independently controlled
2)Electricity: 380V, 50HZ, 3 phases and 5 wires
3)Power: 30-105KW
4)Simultaneously heating upper side and down side of glass.
5)standard size of processed glass can be 3660 x 2440 x 50mm
6)Maximum size of processed glass can be: longer(not limited) x 3300 x 150mm
7)Simens PLC, touching monitor
8)many levels of heating temperatures and many times of heating and heat preservation are allowed to be pre-set
9)Circuit control and airswitch control are all independent
10)4 hooks for easy lifting the machine
11)Maximum working environment temperature: 190℃
12)A hub is available for connecting control set and working set. All wires in between control-set, hub and working set are collected inside protect pipes or cables
OTHER DETAILS
1)Production period: 40-50days after receiving advance payment
2)Advance payment: 30% of order value
3)70% of order value: paid by T/T
4)Delivery after receiving full payment
5)Training in our factory: factory will provide free training to machine operators but trainees will fund themselves for all travel expenses including foods, transportation and accommodation expenses
6)If we installation the machine and training the operator at the your company, the all travel expenses including foods, transportation and accommodation will fund by your company. for 2 persons