Gantry Crane for shipyard
Product Images
Product Property
Product Status : | New |
Sample Available : | yes |
Shipment Terms : | fob,cfr,cif,Negotiable |
Payment Mode : |
T/T,L/C,cash |
Description
1
QLM75-4.5/11 typeGantry Crane
Quotation
Ⅰ. Technical Parameters:
Parts | Qty | Unit | Spec | |
Main beam | 1 | pc | box girder include overhead trolley rail | |
Legs | 4 | pc | box girder | |
Bottom Cross Beam | 2 | set | box girder | |
bottom Trolley | 4 | set | Single Rail , 1/2drive, wheel dia.¢500mm, include rail clear board, buffer block, rail tail stop-block, not include rail. | |
Overhead Trolley | 1 | set | Include 1 set handtailor primary lifting 2JK10 double drum screw reel winch, travelling block group, crown block group, rotatable hook, wire rope, waterproof cover, buffer block, arrange rope shelf. | |
Ladder, Hurdle And Accessory | 1 | set | Include ladder of legs, safety loop, hurdle and walk way of main beam. | |
Control System And Accessory | 1 | set | Include lifting height Limit, Left And Right Movement Limit, Weight Limit of cart and trolley. Buzzer, Lightning Rod, , anemoscope, Inner Electrical Components, inter cable , Connection Parts, control tank, transducer | |
Operator Cabin | 1 | pc | include air condition, Cool and warm, two mode | |
Nip Rail Equipment | 4 | pc | Manual type | |
equipment price | ---------USD(PRICE MADE TO CURRENT CNY-US EXCHANGE RATE AND SHIPPING CHARGES) without rail and outside cable | |||
Spare Parts And Fittings Along With Equipment |
| Whole set, For Free | ||
Assemble And Debug | / | See the service term, send engineer for technique advice | ||
Freight |
| Budget 1 unit 40feet open top container and 4 unit | ||
2.techniqueparameters:
Gantry Crane | ||
No. | Item | Spec |
1、 | Primary Hook Rated Lifting Capacity | 75t |
2、 | Overhead Trolley Static Test Loading | 93.75t |
3、 | Overhead Trolley Dynamic Test Loading | 82.5t |
4、 | Overhead TrolleyLifting Speed | 3.5m/min |
5、 | Overhead Trolley Traveling Speed | 4.75m/min |
6、 | Overhead TrolleyLifting Power | 55kw |
7、 | Overhead Trolley TravelingPower | 4kw |
8、 | Primary Hook Lifting Effective Height | 11m(upon rail height, from rail’s location to hook’s center 31m(under rail height, from rail’s location to bottom ground |
9、 | Overhead Trolley Primary Lifting Parts | 2JK10 double drum screw reel type winch |
10、 | Brake Type | hydraulic pressure double brake |
11、 | DIA. OF Primary Hook WIRE ROPE | ¢30mm |
12、 | primary HookPulley | 2×4 |
13、 | Rope Capacity Of Winch In Overhead Trolley | 2×175m |
14、 | Wire Rope Tier | 2 circles(inside , and outside) |
15、 | Dia Of Overhead Trolley Wheel | 4×¢600 mm |
16、 | 压Design Pressure Of Overhead Trolley Wheel | 27.5 KN |
17、 |
Longway Traveling Speed | 0~50m/min(load speed:0-25m/min) (nonloadedspeed:0-50m/min) |
18、 | Longway Traveling Power | 11kw×4 |
19、 | bottom Trolley Wheel | 8×¢600 mm |
20、 | Design Pressure Of Bottom Trolley Wheel | 21.5 KN |
21、 | Total Power | 107kw |
22、 | Total Weight | ≈90t |
23、 | Working State Wind Speed | ≤6class≤10.8~13.8 m/S |
24、 | Non-Working State Wind Speed | ≤11class≤28.5~32.6 m/S |
25、 | Class Of Steel Structure Use | A5 |
26、 | Span | 32m |
27、 | cantalever | Main, secondary hook no cantalever |
28、 | Recommend Rail | P43 |
Note:whenstart to design and product, above spec changed we will inform to customer andgained approbate.
II.Quality Standard:
Supplier’sproductQLM75-4.5/11is designed, produced, checked and innovated continuously, according Q/HLJ02-2003 Enterprise Standard, Country Standard General-Purpose Gantry Crane GB/T14406-93, and operationsimple, safety practical, sufficiently combining project actual principle.
III. Price:
Equipmentprice: USD
Without rail and outside cable
▲Above quote isvalid within 30 days
IV.Payment:
Prepay30% of the contract total amount as advance payment, pay offspare money for goods before equipment deliver.
V. Delivery Time:
Deliver the goods within45 days afterReceive advance payment.,
VI. After Service
1.The data ofequipment leave factory include: General Chart, Eligibility card, Consignmentlist, Electric element chart, Operation manual etc.
2.The sellerguarantee to quality of 1 year since the date of consignment. If the equipment has any itself’s qualityproblem during the quality guarantee date. Seller replacing parts free andbuyer in charge of the food fee, accommodation fee, interpret fee, personalinsurance fee and out and home airline ticket (or car, train) of after servicetechnicians. But needn’t pay service fee. Out of the quality guarantee date, The food fee, accommodationfee, interpret fee, personal insurance fee, out and home airline ticket (orcar, train) and service fee of after service technicians all are borne by thebuyer. If need to replace parts, the replacing parts fee base on actually costpay to seller.
3.On the premise ofachieving the ground base of equipment by buyer. The seller is in charge oftechnique instruct when adjustment & assembly of the complete equipment, and training for the buyer’s operators.
4.Theseller will send 1-2 technicians fit for the work at Ho chi minh toadjust and Assemble machine for 10 days. Buyer base on the condition ofworking in local, could require seller to prolong the technicians serve time inlocal. Buyer and seller negotiate about the extended time take thecircumstances into consideration. But buyer therefore need in addition pay thetechnique serve fee to seller. The count measure of technique serve fee isUSD100 per man/one day.
5. The buyershould send the invitation letter to the seller before 15days at least.
6. The buyer is in charge ofthe technician’s travel fee of out and home, technician’s food , living, interpretation and person insurance in local on the first time instructand training of adjustment & assembly equipment.
Remarks:
10.As the new law about the Export tax rebates , so we would like both parties tocooperate together, if any law , we told , force majeure happened , we would likeboth party take charge half of the tax that the government collected .
2
3