- Nuclear Reactors, Boilers, Machinery And Mechanical Appliances; Parts Thereof
- Machinery For Preparing, Tanning Or Working Hides, Skins Or Leather Or For Making Or Repairing Footwear Or Other Articles Of Hides, Skins Or Leather, Other Than Sewing Machines.
- Machinery For Making Or Repairing Footwear Of Hides, Skins Or Leather (excl. Sewing Machines)
PVC slipper strap injection moulding machine
Product Images
Product Property
stations : | 24 |
Product Status : | New |
Sample Available : | no |
Shipment Terms : | fob,Negotiable |
Payment Mode : |
T/T |
Description
PVC slipper upper injection moulding machine, PVC single color upper making machine, PVC chappal upper moulding machine.
This is a PVC/TPR/TR slipper or chappal shoe upper making machine, can use to produce differenet type of slipper uppper or shoe plastic upper in hight quality.
Feature:
Staions: 2 PCS;
Colors: Single color;
Model: JG-SH-80T;
Raw materil: PVC/TR/TPR;
Injection Screw: 55mm;
Injection volume: 300-550g,
Injeciton pressure: 30 Tons;
Clamping Ton: 120 Tons;
Mould open stroke: 450x450x180mm;
Machine Weight: 4.5 Tons;
Term of payment:
T/T 40% in advance, balance should be received before shipment;
Delivery Term:
FOB, CFR, CIF for your choice;
Delivery Date:
Within 40 Days after confimed receive firsr payment. (This time already include Shoe mould manufacture day.
Full Turn key project are available for you include installation, Testing, Raw material Formuation and Machine operation training.
This is a PVC/TPR/TR slipper or chappal shoe upper making machine, can use to produce differenet type of slipper uppper or shoe plastic upper in hight quality.
Feature:
Staions: 2 PCS;
Colors: Single color;
Model: JG-SH-80T;
Raw materil: PVC/TR/TPR;
Injection Screw: 55mm;
Injection volume: 300-550g,
Injeciton pressure: 30 Tons;
Clamping Ton: 120 Tons;
Mould open stroke: 450x450x180mm;
Machine Weight: 4.5 Tons;
Term of payment:
T/T 40% in advance, balance should be received before shipment;
Delivery Term:
FOB, CFR, CIF for your choice;
Delivery Date:
Within 40 Days after confimed receive firsr payment. (This time already include Shoe mould manufacture day.
Full Turn key project are available for you include installation, Testing, Raw material Formuation and Machine operation training.