- Articles Of Iron Or Steel
- Tubes, Pipes And Hollow Profiles, Seamless, Of Iron (other Than Cast Iron) Or Steel.
- Tubes, Pipes And Hollow Profiles, Seamless, Of Circular Cross-section, Of Stainless Steel, Cold-drawn Or Cold-rolled "cold-reduced" (excl. Line Pipe Of A Kind Used For Oil Or Gas Pipelines, Casing And Tubing Of A Kind Used For Drilling For Oil Or Gas)
Stainless Steel Seamless Tube ASTM A213 TP347
Product Property
Product Status : | New |
Sample Available : | yes |
Shipment Terms : | fob,cfr,cif,Negotiable |
Payment Mode : |
T/T,L/C |
Description
01) Commodity: Seamless austenitic stainless steel pipes or fluid and gas transport
02) Process method: Cold drawn/cold pilgered
03) Surface finish: Annealed/cold pilgered/manual polished/mechanical polished
04) Material: TP347
05) Standards: ASTM A213
06) Size:
A) NPS: 1/8" to 20"
B) Schedule: 5/5S, 10/10S, 20/20S, 40/40S, 80/80S, 120/120S, 160/160S, acc. To
ANSI B36.19/36.10
C) O. D.: 0.405" to 20"
D) W. T.: 0.049" to 1.125"
07) Length: Max. 12 meters
08) Delivery conditions: Solution annealed, pickled, grey white, with plain end or beveled end
09) Applications: For fluid and gas transport; Structure and machining, for heater exchanger, condense
10) packing: Plastic bag for each piece then packed in seaworthy wooden cases or iron crates
11) Min order quantity: 1 metric ton or upon negotiation
12) Delivery date: Min. 45 days
02) Process method: Cold drawn/cold pilgered
03) Surface finish: Annealed/cold pilgered/manual polished/mechanical polished
04) Material: TP347
05) Standards: ASTM A213
06) Size:
A) NPS: 1/8" to 20"
B) Schedule: 5/5S, 10/10S, 20/20S, 40/40S, 80/80S, 120/120S, 160/160S, acc. To
ANSI B36.19/36.10
C) O. D.: 0.405" to 20"
D) W. T.: 0.049" to 1.125"
07) Length: Max. 12 meters
08) Delivery conditions: Solution annealed, pickled, grey white, with plain end or beveled end
09) Applications: For fluid and gas transport; Structure and machining, for heater exchanger, condense
10) packing: Plastic bag for each piece then packed in seaworthy wooden cases or iron crates
11) Min order quantity: 1 metric ton or upon negotiation
12) Delivery date: Min. 45 days