The pretreatment line is refers to the steel products before the processing after the superficial abrade stain removal, spreads protection period primer and dries the varnish film the processing craft. Plate after pretreatment processing, may sharpen component's corrosion resistance ability, and fatigue resistance energy.
The QXY pretreatment line mainly has the expulsion system, the preheating installment, the abrade cleaning up, the painting, the drying system, the dust removal and paint fog compositions and so on processing system, electrically controlled system. According to the different type, its working width in 1m~5m, pretreats the production line widely to apply in the shipbuilding, the automobile, opens professions and so on ship, elevator, chemical industry, locomotive.
Our company produces the steel plate pretreatment production line, has the following characteristic:
The complete machine uses the PLC automatic control, brings the colored touchscreen man-machine contact surface, the automaticity to be high, the operation maintenance is simple;
The entire line transportation uses the frequency conversion velocity modulation control;
The painting reciprocation organization uses the special-purpose reciprocation sliding table mold train, imports the servo motor-driven, the precision is high, the noise is small. The reliability is good.
Uses the American Solid Zerk Company airless spraying system, the spray coating even reliable. The maintenance work load are few.
Uses the pulse instead to blow the filter drum dust removal, the environmental protection economy, the dust removal efficiency is high,
Steel plate and section pretreatment line technical parameter (next table) Project pattern | QXY-1500 | QXY-2000 | QXY-2500 | QXY-3000 | QXY-3500 | QXY-4000 | Abrade | 4~6 | 6 | 6 | 6 | 6~8 | 8 | Single Taiwan abrade electrical machinery power | 15~22kw | 15~30kw | 15~30kw | 22~37kw | 22~37kw | 22~37kw | Cleaning up speed | 1~5m/min (the Sa2.5 level, according to cleaning up steel plate computation, looked specifically matches abrade electrical machinery amount of power) | Electric appliance control system | The entire line frequency conversion velocity modulation, the PLC control, brings the touchscreen, the painting reciprocation to use the import servometer control | Drying | May request according to the user to use the electric heating, the fuel oil heating, the fuel gas heating way or the far infrared heating way | Steel plate | Width | mm | 1000-1500 | 1000-2000 | 1000-2500 | 1000-3000 | 1000-3500 | 1000-4000 | Thickness | mm | 5-32 | 5-32 | 5-32 | 5-60 | 5-60 | 6-80 | Length | mm | 6000-12000 | 6000-12000 | 6000-12000 | 6000-12000 | 6000-12000 | 6000-12000 | Section | Biggest cross section size | mm | 1000×250 | 1000×300 | 1500×300 | 1500×300 | | | Length | mm | 2400×12000 | 2400×12000 | 2400×12000 | 2400×12000 | 2400×12000 | 2400×12000 | Component | Extreme breadth | mm | | 800×300 | 1500×300 | 1500 | 800 | | Greatest altitude | mm | | | | 500 | 500 | | Greatest altitude | mm | 2400-12000 | 2400-12000 | 2400-12000 | 2400-12000 | 2400-12000 | | Table load | T/m | 1 | 1500 | Coating film thickness | um | 15-25 | 15-25 | Equipment total output | | According to actual situation determination | Equipment area | | About equipment long 50m (chopping board long 12m calculates), occupies a land area of 5~9m (not including dust removal system), high 7~8m (does not contain pit depth) | Pit size | | 1.5~3.5m, the waterproofing, do not seep |
|
|